…PetroGM LLC completed a project for Evrotek-Yugra JSC constructing a 3D geomechanical model and a 4D - coupled geomechanical and hydrodynamic model to justify development of the field with multilateral wells (5 boreholes each) with open-hole completion.

Based on the constructed models, hydrodynamics simulation were made to capture changes in reservoir pressure and stress-strain state of the reservoir as a result of production, the timing of open hole collapse was predicted, optimal modes and parameters of production regime were determined.

We would like to stress the complexity of the project and the uniqueness of some of the technical solutions proposed by PetroGM experts.

The work was carried out at a high level, the results of the work performed helped in determining the field development strategy.

We express our gratitude to LLC "PetroGM" for the high-quality job.